The upper hall was not part of the
original building. |
|
Views of the lower hall taken as slides
by Mr Ettling in July 1970, |
|
By May 1971 the main fabric of the extension was in place... |
|
...the radiators installed and just the flooring to be laid. |
|
The official opening |
|
|
|
|
|
|
|
First uploaded: 19 September 2003
Last updated: 20 November 2018