As
part of our work on Safe Routes To School we have a The
creation of the Travel Plan gave the two Breakspear Schools |
|
|
|
The
site was to be the far |
The
base for the shelter was |
|
|
A lorry of liquid concrete arrived... |
and the concrete was pumped through onto the marked area. |
|
|
The
surface of the concrete was tapped down to get rid of trapped air |
|
|
|
Several
days later, when the base had set firm, |
|
|
|
It quickly took shape. |
|
|
|
The finished shelter all ready for use. |
|
|
|
There
is a special, new, entrance |
It certainly looks very smart. |
First uploaded: 10 October 2006
Last updated: 21 December 2018