Spring / Summer 2008  ~ The Studio Project - 13

                

The new floor was been covered to protect it 
as work continued over the summer holiday.
Large pipes were installed to provide ventilation. These were then boxed in.

 The folding screen giving access to the storage area was fitted, 
and the musical instruments moved down from the hall.

The main wall is fitted with mirrors, all designed to the highest safety specifications.
This wall gives an added sense of space, increases light and, as with the music room where we have also placed a mirror,  provides an opportunity for children to review their own movements in dance, drama and music.
A pull-down screen is also available.

 The lighting and projector mount were put in place...

and the sanitary fittings installed in the two toilets. 

The start of the new school year was just a week away
and the fencing came down ready for tarmac to be laid. 

Just days before the start of the autumn term the trenches dug to carry water, 
gas and the electrics are back filled and then covered with tarmac.

     
    