The foundations for the walls now being in place building materials now need to be got to the quadrangle. It would be too time consuming to take everything through with a wheel barrow so the decision is to lift everything needed into the quadrangle by crane. The staff car park in front of the school is closed on Friday 2 May to allow the delivery of all the material to be 'craned in'. |
|
|
|
Since the workmen will also use the crane to put in place the aggregate on which will be built the ground floor, they prepare the area with vertical rods which will give strength to the base. |
|
|
|
|
|
8 a.m. Saturday, 3 May and the crane arrives. |
|
|
|
We've had cranes
on site before to move sheds and the PA portacabin, |
|
|
|
This view, taken from Hoylake Crescent demonstrates just how high it was. |
|
|