Spring / Summer 2008  ~ The Studio Project - 2

            

The foundation trenches dug... and the site of the new bin store prepared

All was ready for the liquid concrete to be poured into the trenches.

Not the time to lose your footing!

Once the concrete foundations were solid a low course of bricks was laid.

It was now possible to trace the sections of the new building.

     
    