Concrete 'joists' were then laid on the low brick walls. |
|
Meanwhile, the new bin storage area was completed: they looked much tidier. | |
|
|
Once all the
joists were in place, the drainage and sewage pipes were all put in
place. Then large bricks were inserted into the spaces |
|
|
|
At the end of
March the Local
Authority eventually gave approval |
|
|
|
|