Late June, and a trench was dug from the studio to the main school entrance in Bushey Road. This was where the link to water and electricity would be made. |
|
|
|
Meanwhile the doors and windows were being added to the studio. |
|
|
|
|
|
Inside the studio
area all the electricity cables were in place |
|
|
|
|
|
|
|
First uploaded: 12 July 2008
Last updated: 24 December 2018