Once the room was added to the extension during the first week of the summer holiday, the access hatch through to the first floor level was closed and work started on the ceiling. First cables were run through for lighting, then insulation was packed in, finally the pasterboard ceiling fixed into place. |
|
|
|
|
|
Next, all the
materials were cleared out of the quadrangle and the access route closed
by bricking up the final section of wall and installing the last window. |
|
|
|
The radiators were
fitted. |
|
|
|
The start of the
autumn term: |
|
|